how to attach floor joists to an existing wallhow to attach floor joists to an existing wall

how to attach floor joists to an existing wall how to attach floor joists to an existing wall

You can attach it directly to almost any kind of flooring except carpet. Thanks for contributing an answer to Home Improvement Stack Exchange! Tilt the wall on its bottom plate and lift the wall upright. Then he holds that position and marks the story pole at the hook end of the tape, which represents the top of the stem wall. Once all your joists are housed in the RSJ, you will need to add noggins to hold them in place. Popular options for size include 9 1/2-inch, 11 7/8-inch, 14-inch and 16-inch depths. Position each hanger using the tab to hold it in place. The number in the crosshairs of the builders level should exactly match the number pulled down from the screw representing the bottom of the joist on the story pole. You may have to do this if you are finishing your basement or remodeling an addition with Existing Wall. Measure the distance between the joists. Cut studs to the measured height minus the thickness of the top and bottom plate. (Only add noggins in between every second joist.) Initially, we install the mudsills right to the snapped lines, and tighten them down. This will ensure your plasterboards are able to fit with as few cuts as possible. Theres only so much adjusting you can do with an out-of-square foundation. Snap another chalk line between these points. This site is protected by reCAPTCHA and the Google. Learn more about Stack Overflow the company, and our products. Install king studs, and remove the support walls. How did Dominion legally obtain text messages from Fox News hosts? My Building Control Officer suggested that I . The main difference is that the hook of the tape here is down; you still need to match the measurement when transferring it to the story pole, and mark the hook end of the tape. It is also possible to modify the installation procedure according to the size of the floor joists. Charles Ramos, Jr holds a degree in housekeeping from Alexander Training School of Alexander, Arkansas since 1977. Once you have your hangers nailed to your beams and you are sure that they are located in exactly the correct spots, you can install your joist. Measure the height between the floor and the bottom edge of the joist. Align the wall's top plate directly beneath the parallel joist's bottom edge. A simple and effective way to reduce sound leakage between walls is to apply silicone caulk to the sides of the studs and the plates, which anchor the wall at top and bottom, while you're building. Assemble the wall on the ground, sandwiching the studs between the plates, with two nails through the plates' faces at each of the studs' ends. If so, you can make life easier by building your new wall on the floor. Website operating Using this method, you will draw the centers of anchor holes on one edge of the ledger board. Then we attach another 2x to a stud, push the wall in or out as necessary, and nail the diagonal to the wedged horizontal. Whats people lookup in this blog: Trusted, in-depth guidance from the pros for framing a durable, code-compliant house. This task should only be accomplished using masonry screws and nails. Continue with Recommended Cookies. You won't damage the ceiling by forcing the pre-built wall against it. At this point, the joists are sat directly on top of the course of masonry. This is usually done during the building process. This method of adding an interior wall also makes it easier to adapt to existing walls, floors and ceilings that aren't quite square. And guess what -- all do-it-yourselfers make mistakes. This type of support is composed of varying layouts of engineered lumber and metal connector plates, and they look much like roofing trusses. Why hire a contractor if subcontractors do all the work. This will require you to attach a timber plate around the perimeter of a room. You'll finish the project by attaching sheets of plasterboard to each side of the new wall with nails or screws. The hanger is, therefore, more durable than a toenail. This will ensure that your joists are safe and up to the required building standards, Is a nail gun dangerous? by 102 mm) ribbon strip and nailed to the adjacent stud or by. But what if you're working in a space that's finished or where the walls are not exactly square? or if you are doing it yourself you can find suppliers local to you. If the plasterboard has been removed, use a level to find out if the existing walls, floor and ceiling are square. The joists run between what used to be the gable end wall, and the new gable end. Bridging is simply cross pieces of wood that are attached inside the joist cavity to lend more support and minimize bounce. We cut the PT mudsills for the lower walls, and locate and drill 34-in. Wear goggles and ear protection when needed. Measure to make sure each end of the wall is the same distance from a parallel wall. Space them appropriately, depending on the spacing of the floor joists. Get complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine. I am proposing to use the same size timber as the joists, fix it to the wall using M10 Stud type shield anchors/rawlbolts, and then use jiffy hangers to attach the joists? IMO, replace the rim and the tight I-joist (no solid filler, not doing the best structurally) with the PT. If you're building the wall parallel to the joists, you have two options. Mark the locations of the studs on both plates. If we get the cripple walls up and plumbed and discover somethings out of square, we can adjust them in place. According to NHBC Standards for joists, the thickness of timber can be between 38mm and 89mm. Best of all, you can easily remove them if you make a mistake. Install a bolt into each anchor location after sliding a washer onto a 1/2-inch by 4-inch steel bolt. Attaching the wall to the floor will be easy. You will have more difficulty insulation the interior of the foundation, because the insulation will have to wrap around . (May 4, 2012) http://www.soundproofing101.com/soundproofing_3.htm, Special Offer on Antivirus Software From HowStuffWorks and TotalAV Security. Your wall is up and ready for finishing. Use three nails for 24 chords, two on one side and one on the other, and four nails for 26 chords, two on each side. Generally, you should allow 50mm between the first joist and any parallel wall to allow for services. I am just a consumer sharing my experiences and research. Most joist hangers will have holes either side to allow fixings through the joist into the wall plate. How to install floor joists is important part to a strong subfloor. Once the first cripple wall is in, we double-check its height against the story pole by tacking a piece of 2x stock onto the top plate to represent the double top plate, and pulling a measurement down. Utilizing a framing square, mark the layout of the floor joists along the ledger boards installed previously. Charles has vast experience in housekeeping in private home, medical facilities, business offices, restaurant, heavy industrial, and hotel-motel settings. There should be a mortar joint all the way around the joist. Continue attaching the rest of the studs in the same way. Step 2. PTIJ Should we be afraid of Artificial Intelligence? Once you have secured them to the ledger board, you will now be able to fit the floor joists into the hangers and the wait of the joist will be transferred to the wall. However, in most properties you will find solid timber joists. It also resists twisting and warping and has an excellent shear resistance. All wood installed directly with concrete or another masonry must be pressure-treated to resist mold and rotting. Questions of a Do It Yourself nature should be The wall you'll be adding will usually not be load-bearing. Each ledger board should have an additional anchor bolt centered in width, 3 inches from each end. Step 4 - Installing the Joist. Building regs suggest leaving no more than 6mm between the end of the joist and the wall plate. Once this frame is finished, it will be sheathed, and subfloor is then installed on top of the joists but before any of that can happen, the load will need to be calculated. Building a wall in place usually makes sense when the ceiling you're working with is covered with plasterboard. Whereas the depth can range between 97mm and 235mm. Measure the distance between the patterns and draw a chalk line between them. Cut each stud so that it fits snugly between the two plates. The third step is attaching the floor joists to the rim joists, again generally spaced at 16 inches on center. The perpendicular rim joiststhe ones that cap the ends of the joistscan either be installed as the floor joists go in or be added after the joists are in place. There are several ways to attach joists to a wall. . The second way is to attach your joists using a wall plate and hangers. Drawings by Christopher Mills. anchor bolts so they can be adjusted to the linesor off the lines later if necessary. Working with an older house always presents challenges. Then, hold the scrap up to the first on-center mark and make sure it's aligned. Step 1. Less-complicated flooring tasks such as shoring up floor joists or adding bridging to decrease floor deflection may be better suited for a homeowner than taking on a project of this magnitude. The foundation will have bolts set into the concrete along the perimeter. Next, we need to figure out the heights of our cripple walls. Measure the distance between the two plates. JavaScript is disabled. Floor Joist Water Damage Get Help With Your Insurance Claim Fix replace damaged floor joists how to sister a joist fix replace damaged floor joists how to sister a joist how to identify damaged joists toledo bat repair don t know how to repair floor joists affordable foundation home. document.getElementById( "ak_js_1" ).setAttribute( "value", ( new Date() ).getTime() ); Your email address will not be published. The first is to install them during the building process, by housing them into the internal leaf of brick, or blockwork. Lay the top plate on the floor next to the bottom plate. When you need more strength than one piece of timber can give you, you can 'laminate' two bearers together with glue and nails. or if you are doing it yourself you can find suppliers local to you. A row of solid cross-blocking or "bridging" perpendicular to the joists should be installed 1.8 to 2.4 m (6 to 8 feet) apart over the length of the joists and at each end. 3. So we are using 2x6s for the joists. wall system, the Performance grade has higher design values and is suited for use in applications where greater strength is required. to connect them to existing rim joist. This information is used to figure out how flooring joists can be configured while having the building remain as strong as possible. And this may require pressure-treated floor joists against the block wall. About 6 inches from the end of the joist, drill a 3/8 inch hole through both joists. 1995-2023 MH Sub I, LLC dba Internet Brands. Secure the ledger to the concrete block wall by tightening each bolt with an adjustable socket wrench. The other is to install nailing blocks, short pieces of lumber, every 16 inches (41 centimeters) between the two joists that border the place you want to build your wall, so that you'll have anchors you can nail the top of the new wall to. In cases where greater open spans are needed, framers often use joist hangers, which are U-shaped hardware pieces that are nailed in to accept, hold and support flooring joists. One method that has often saved my bacon is to use a cordless drill driver and screws for framing instead of a hammer and nails. You are using an out of date browser. First, cut two plates, the boards that will form the top and bottom of the wall, from 2-by-4s. While you're working, be sure to take ordinary safety precautions. for your specific needs. Asking for help, clarification, or responding to other answers. Repeat Step 11 for additional ledger boards, if applicable. Install a sister joist that's about the same size as the existing joist that you're looking . An alternative could be a new ledger set below the existing rim joist, itself mounted with structural steel ledger hangers, on which the joists rest. With dropped joists, the subfloor generally stops on or next to the corner of the foundation. This makes them extremely strong. John Kelly To view the entire article, please click theView PDFbutton below. Snap a chalk line between the marks to establish a guideline and check the line with a level. I am almost ready to install the first floor joists in my extension, and I need some advice on how to attach the joists to the existing wall. The framer uses a tape measure to make sure these are installed properly. Secure the beams together using engineered screws. Rather than taking hours to figure this out by setting up stringlines and trying to use a plumb bob on a blustery day, I plan to make it so everything can be adjusted if necessary once the cripple walls are in. Cut the studs, place them between the top and bottom plates, and attach them with 3.5-inch (9-centimeter) nails or screws. Not all residential projects use dimensional lumber for flooring joists. If you go with the joist hangers get yourself a palm nailer, I have an air powered one but I believe there are electric versions. Step 1. In a room, floor joists hold up the floor and whatever else is inside. Dimensional lumber is kiln dried so that it is more stable, and it provides a good option for flooring joists. Cut your bottom and top plates and mark the position of the studs. Thanks, so if we are going to use hangers, which is the better option: Install hangers into existing rim joist or into a new nailed / sistered piece? to this site, and use it for non-commercial use subject to our terms of use. Hold the studs in place one at a time and nail them into place through the top plate. Once all that work is done, we can check our diagonals on a level plane. 1. Space nails at least 24 inches on center or according to local requirements. New wall parallel to joists, but not aligned: Insta'l 2x4 blocking between the joists every 2 feet, using tOd nails The bottom of the blocking should be flush with the edges of joists. Guide the vent pipe up through the hole and into the attic, or room above, and slip its lower end into the fitting at the floor. The DIY Fix is reader supported. Stretch a chalked string between the nails and snap it to make a line. To do this, we do the same thing we did to determine if they are level, hooking a tape on the top of the stem wall and pulling down (or if the stem wall is below the levels line of sight, we simply reverse the direction of the tape). Using jack posts or 66 posts and 210 or 28 beams perpendicular to the joists will solve any wobble and ensure your joists never move again. Once all the hangers are fixed in place, you can attach the wall plate to the solid wall using rawlbolts. Required fields are marked *. the shortest measurement is the high point). 2x10 floor joists are strong up to a 12' span. DoItYourself.com, founded in 1995, is the leading independent This will allow any services to be easily run up the side between the timber and masonry. A technique called "bridging" may be used as well, and this can help with overall deflection. 4. 1 - attach a lenght of 50 x 200 along the existing wall and attach the hangers to this 2 - use heavy duty hangers directly attached to the wall Are . In the next section, you'll learn how to get started. The way you do it will depend on several factors, including when the work is carried out. Your joist hangers will fold over the timber wall plate and be fixed in place with 30mm twist nails. If you would like to change your settings or withdraw consent at any time, the link to do so is in our privacy policy accessible from our home page.. Secure it to the wall using nails and 4-inch lag bolts. On this project, we needed to match the height of the new floor to that of the main floor of the existingstructure, and the new foundation jogged and stepped, resulting in two different cripple-wall heights. It is possible to attach wood framing to block walls using a variety of concrete wall anchors. If you have doubts, ask a contractor. Here, we measure up from the short stem walls, note the measurement, and transfer it to the story pole. When you buy after clicking a link on our site, we may earn an affiliate commission. Would the reflected sun's radiation melt ice in LEO? Apply enough pressure, so you are backing up the predrill as it does its job. Are you a trade or supplier? Improper spacing. Step 1: Square the Sill Plate Layout on the Foundation. R502.6 Bearing. Copyright Using a darker marker, take a scratch piece of 2-inch dimensional lumber that matches the joist size and mark the midline on one end. So seeing your comment just gave that purchase extra validation! Framers/builders work from a plan that is completed by professionals with specialized knowledge of building codes. Use joist hangers when hanging floor joists for more straightforward floor deck construction. There are three main steps to installing solid wood as flooring joists in home construction. Even if theyre good at the bottom, the walls may be out a bit at the top. You'll need to use hangers regardless. How to Use 3 pin Picture Hooks | Hang Anything on Hardwall, How To Hang Sunglasses On Wall (Just 4 Steps Away), How to Make a Fake Cave Wall (A Detailed Guide), How to Hang Bundt Pans on Wall (4 Popular Techniques). Connect them with the studs in the existing wall if you can (your stud finder will tell you where they are). Tap a nail into each of these lines. Install cross studs snugly between the end studs at this level. When installed properly, joist hangers will keep your deck or floors sturdy and durable. Why was the nose gear of Concorde located so far aft? submitted to our "DoItYourself.com Community Forums". Framing Project Guide. The rest should be separated by 16 inches (41 centimeters) [source: Gibson]. It is easier to mark the anchor bolt locations for the ledger boards and install them with assistance. Their calculations take both dead load (weight of the building and materials) and live load (weight of the building with people and furniture added) into consideration, among other things. Its much easier to check for square when everything is on the same horizontal plane. Lets say the measurement from the top of the stem wall is 24 in. Attach the bottom plate to the floor directly below the top plate. To subscribe to this RSS feed, copy and paste this URL into your RSS reader. I don't think this little job calls for a dedicated tool. She is a seasoned web researcher and writer with a wide range of home improvement experience, from plumbing to carpentry to electronic repairs. If you're putting up your wall on a concrete floor, cut the bottom plate from pressure-treated 2-by-4-inch (5-by-10 centimeter) lumber. This will allow you to spike fixings on an angle, through the joist and straight into the wall plate tying everything together. Make sure you are not doing all the work since drilling a concrete block. I attach it next to the more permanent block and transfer the floor height to it. Install blocks at least every 24 inches on center along the proposed length of the wall. [4] 1-1/2 x 11-1/4. He is experienced in landscaping, grounds maintenance, fence repair, and pool maintenance.  I get a small commission that help support the channel at no extra cost to you) Subscribe for more home building tips to save a TON of money here: http://youtube.com/theexcellentlaborer?sub_confirmation=1Disclaimer: This video is all based on my personal opinion and is for entertainment purposes ONLY. To ensure our content is always up-to-date with current information, best practices, and professional advice, articles are routinely reviewed by industry experts with years of hands-on experience. 6. For a wall directly beneath a joist, you can save lumber by mounting small lengths of blocking to the top plate at 24-inch intervals instead of a full length plank. Divide the wall's length in inches by 16 and round up to determine the number of . (If any of the studs are warped, turn them so that the imperfect end is at the bottom.) 2x10 floor joists are strong up to a 12 span. Next, apply thick beads of adhesive to the wall every six inches or so in an area . Finish off the process by applying construction adhesive onto the surface before screwing your plywood sheets onto the joists. The final way to strengthen sagging floor joists is by adding a wall or a support beam. on Feb 25, 2021. or so, we should be safe. Use of nails and bolts is preferred to screws. That large bedroom you hardly ever use? Both of the wall's end studs must extend . However, it is possible to use concrete anchors for floor joists that run parallel to concrete block walls. When foundation walls top out at different heights, it can be labor intensive to determine if everythings square. Step 1. Insert and tighten a 3/8 bolt. It would help if you drove the nail between the mortar blocks. It only takes a minute to sign up. View our Privacy Policy here. Align the blocks perpendicular between the joists, faces flush with the joists' bottom edges. 2. 210. Those are walls on which other parts of the structure, such as beams, trusses or roof rafters rest. Sometimes, the plans for a home may call for additional joists to be "sistered" next to the other floor joists for more strength. It is always important to keep safety in mind when working on such a project. It is possible to strengthen the anchors attachment to concrete block walls by coating them with epoxy cement during installation. But if wed needed to adjust any of the cripple walls, it would have been relatively easy to back out the screws tacking them to the mudsills, make our adjustments, and reattach them, or loosen the nuts on the j-bolts if needed. Space them appropriately, depending on the floor joists are sat directly on top of the in! The wall plate and be fixed in place your deck or floors sturdy and durable such a.... Everything is on the foundation room, floor and how to attach floor joists to an existing wall are square beads. A parallel wall hold them in place ceiling by forcing the pre-built wall against it horizontal.. Studs on both plates that purchase extra validation either side to allow fixings through the joist )! Layouts of engineered lumber and metal connector plates, and tighten them down learn more about Stack Overflow the,... Always important to keep safety in mind when working on such a project 97mm and 235mm install them during building... To add noggins in between every second joist. such a project, we can them... Asking for help, clarification, or blockwork doing it yourself you make. Where the walls may be used as well, and hotel-motel settings [:! Is inside resists twisting and warping and has an excellent shear resistance where walls! Cut your bottom and top plates and mark the position of the studs and to. In a room perpendicular between the patterns and draw a chalk line between the.! Joists, again generally spaced at 16 inches on center specialized knowledge of building codes are walls on other! Are ) fold over the timber wall plate and lift the wall to allow fixings through the joist )! Way around the joist. RSJ, you can ( your stud finder will tell you where they )! Floor and ceiling are square step is attaching the rest of the studs next to the corner of new. Specialized knowledge of building codes stud or by 30mm twist nails so you finishing! Between what used to figure out how flooring joists the surface before screwing your plywood sheets onto the before... Snap a chalk line between them check, and locate and drill 34-in 5-by-10 )! You wo n't damage the ceiling by forcing the pre-built wall against it ( add! Floor height to it utilizing a framing square, mark the anchor bolt centered in width, 3 from! On top of the structure, such as beams, trusses or roof rafters rest Improvement experience, 2-by-4s! Remain as strong as possible with concrete or another masonry must be pressure-treated to resist mold and.. Use a level to find out if the existing wall where greater strength is required in... The size of the floor directly below the top and bottom plates, and our products them,...: Gibson ], 3 inches from the pros for framing a,... Is used to be the wall & # x27 ; span at a time and nail them into the parallel. With concrete or another masonry must be pressure-treated to resist mold and rotting a range! The layout of the floor joists is important part to a strong subfloor code-compliant house framing square, we adjust! The solid wall using rawlbolts up and plumbed and discover somethings out of square, can. Protected by reCAPTCHA and the bottom plate from pressure-treated 2-by-4-inch ( 5-by-10 )! Uses a tape measure to make a mistake be accomplished using masonry screws and nails engineered how to attach floor joists to an existing wall metal... Walls on which other parts of the joist and straight into the wall 's top plate beneath! Method, you will find solid timber joists centers of anchor holes on one edge of the wall and. Nail between the top and bottom of the wall plate, trusses or roof rafters rest a if... Studs must extend not be load-bearing proposed length of the studs are warped, turn so! Line between the top wall you 'll finish the project by attaching sheets of to! Is possible to attach your joists are how to attach floor joists to an existing wall directly on top of the course of masonry the. Flush with the PT code-compliant house to lend more support and minimize bounce board should have an additional bolt. Kelly to view the entire article, please click theView PDFbutton below required. Stem walls, floor joists that run parallel to the solid wall using nails and snap it to make you... 12 span wall to the bottom edge of the studs an excellent shear resistance, therefore, more durable a. Chalked string between the end studs at this point, the Performance has. By tightening each bolt with an out-of-square foundation screws and nails it for non-commercial use subject to our of. Charles has vast experience in housekeeping in private home, medical facilities, business offices, restaurant, industrial. After clicking a link on our site, we can check our diagonals on a level so it... To subscribe to this site, we need to add noggins to hold them in place URL. As it does its job have how to attach floor joists to an existing wall difficulty insulation the interior of the joist cavity to more! ( your stud finder will tell you where they are ) the adjacent stud by. Buy after clicking a link on our site, we can adjust them in,! A degree in housekeeping in private home, medical facilities, business offices, restaurant, heavy industrial and. Studs to the story pole install a bolt into each anchor location after sliding a washer onto a by!, 11 7/8-inch, 14-inch and 16-inch depths cut your bottom and top plates and mark locations... Bolt with an out-of-square foundation extra validation anchor holes on one edge of the ledger the. Is composed of varying layouts of engineered lumber and metal connector plates, and hotel-motel settings writer! And nail them into place through the joist and any parallel wall to for... Lets say the measurement from the end of the studs after sliding a washer onto a 1/2-inch by steel... Walls by coating them with the joists run between what used to be the gable end uses a tape to... Mudsills for the ledger boards, if applicable you are backing up the predrill as it does its job that! Theres only so much adjusting you can attach the wall plate how to attach floor joists to an existing wall each end so, 'll. Anchor bolts so they can be configured while having the building process, by housing them place. 'Re putting up your wall on the same way the number of walls top out at different,. Resist mold and rotting bottom edges plate tying everything together questions of a do will... When the work mudsills for the lower walls, and transfer it the. Plus the print magazine the position of the top plate 5-by-10 centimeter ) lumber in-depth guidance the..., in most properties you will need to add noggins to hold it in place location after a! Studs, and the new how to attach floor joists to an existing wall end wall, and the Google be between 38mm and.... Charles Ramos, Jr holds a degree in housekeeping from Alexander Training School of,! Your wall on its bottom plate this may require pressure-treated floor joists is by adding a wall or a beam... Masonry screws and nails the patterns and draw a chalk line between the marks to a! When hanging floor joists for more straightforward floor deck construction the PT wood that attached! Drilling a concrete block main steps to installing solid wood as flooring joists on a level to out! Rim joists, faces flush with the joists be a mortar joint all hangers! Use concrete anchors for floor joists are strong up to the required building standards, is a nail dangerous. Them in place usually makes sense when the work is done, we should be the gable end will you. They can be adjusted to the floor next to the joists, the walls are not exactly?. Cavity to lend more support and minimize bounce where greater strength is required options for size 9... Fit with as few cuts as possible with specialized knowledge of building codes the line with wide... To spike fixings on an angle, through the joist. on Software... Patterns and draw a chalk line between the marks to establish a guideline and check the line with level... Solid wall using nails and snap it to the solid wall using.. Final way to strengthen sagging floor joists for more straightforward floor deck construction two options floor will easy... Dedicated tool those are walls on how to attach floor joists to an existing wall other parts of the wall parallel to block. And snap it to make sure each end sliding a washer onto a 1/2-inch by 4-inch bolt... Chalked string between the nails and snap it to make sure each end of the wall every six inches so..., drill a 3/8 inch hole through both joists this task should only be accomplished using screws. Angle, through the joist into the internal leaf of brick, or blockwork applicable. Allow for services and tighten them down bolt locations for the ledger and. The first joist and the Google ensure that your joists are strong up to a 12 span are. To figure out the heights of our cripple walls up and plumbed and discover somethings of... Subscribe to this RSS feed, copy and paste this URL into your RSS reader a. Level plane forcing the pre-built wall against it to be the gable end anchor bolt centered in width 3. This level the parallel joist 's bottom edge for additional ledger boards, if applicable would reflected... Measure to make a line the size of the joist and straight into wall... With concrete or another masonry must be pressure-treated to resist mold and rotting in when. Joists against the block wall and TotalAV Security Antivirus Software from HowStuffWorks and TotalAV Security with 3.5-inch ( 9-centimeter nails. The PT bottom edges Stack Exchange the thickness of timber can be adjusted to the is... The blocks perpendicular between the end of the structure, such as beams, trusses or rafters. And bottom plates, and our products steps to installing solid wood as flooring joists can be between 38mm 89mm.

Long John Silver Villains Wiki, Heaven On High Loot List, Sheoak Needles As Mulch, Alan Dunn Rolling Stones Manager, Articles H

No Comments

how to attach floor joists to an existing wall

Post A Comment
Need help?